Repository logo
Home
Research Outputs
Collections
Statistics
Shared Repository Homepage
  1. Home
  2. Cultural Heritage Shared Repository Service
  3. National Trust
  4. Article
  5. Busy Beavers: The Turbidity Signature of Ecosystem Engineers at Work

Busy Beavers: The Turbidity Signature of Ecosystem Engineers at Work

Thumbnail Image
Download
Name

Hydrological Processes_2026_Bradbury_Busy_Beavers_The_Turbidity_Signature_of_Ecosystem_Engineers_at_Work.pdf

Size

4.02 MB

Format

Adobe PDF

Checksum (MD5)

4d6599497df35cba4fe7f3e4bfe5f1dd

Resource type
Journal article
Creator (person)
Bradbury, Gareth
Puttock, Alan
Coxon, Gemma
Clarke, Stewart
Brazier, Richard E.
Date published
July 2026
Abstract

ABSTRACT

Beavers are the quintessential ecosystem engineers. In slow‐flowing streams, they create complex wetlands with ponds by building dams and canals that can positively impact biodiversity, hydrology and water quality. These activities can interchangeably capture or release sediment along the watercourse. To date this has not been quantified at the resolution of rainfall events or beaver activity. This study used 15‐min frequency, sustained monitoring upstream and downstream of a newly establishing beaver wetland to measure episodic changes in water turbidity at an event resolution. Monitoring showed no significant differences between upstream and downstream turbidity over 160 days when the first pair of beavers, known not to be building dams or canals, were resident. Shortly after introduction of another beaver pair, however, dam building, burrows and canal excavations were quickly observed, resulting in the creation of a complex beaver wetland between 2021 and 2024. Monitoring over 375 days during this period showed significant differences. Downstream turbidity was significantly higher overall than upstream: 13.1 Nephelometric Turbidity Units (NTU) compared to 4.2 NTU. Stochastic spikes in downstream turbidity during the study period not recorded upstream were associated with dam building and burrowing. Overall, there was no significant difference in turbidity loads, which was at least partially explained by a reduction in discharge downstream, particularly in higher flows, during the dam building period. This demonstrates a complex system with the trapping of influent sediment, the storing of water and the periodic release of beaver wetland sediment leading to net balance in loads. These results help provide context for other studies which have used temporally discrete sampling campaigns rather than continuous high‐frequency monitoring. They provide a unique insight into the downstream impacts of a rapidly developing beaver wetland over its first three and a half years in a landscape that hasn't had beavers for over 400 years.

Funder
Funder nameISNIAwards
Natural Environment Research Council
Grant Number: NE/R0115241
UK Research and Innovation
Number: MR/V022857/1
Journal title
Hydrological Processes
Volume
40
Issue
7
Publisher
Wiley
ISSN
0885-6087
Rights statement
In Copyright
External DOI
10.1002/hyp.70661
Keywords
fluvial
mobilisation
sediment
storage
transport
wetland
zoogenic
Collection
Nature and Science
2026 Research Outputs
Metrics
Managed by the British Library and supported by the AHRC

Built with DSpace-CRIS software - Extension maintained and optimized by 4Science

  • Cookie settings
  • End User Agreement
  • About
  • Contact
  • Help
Repository logo COAR Notify